Walakpa, July 30, 2015

We got up with the goal of getting packed up.  It wasn’t clear if the UICS logistics staff would be able to come and get us today, but we decided to finish all the field work, and pack up as much as possible.  We got right on the screening, and recording of the edges of the midden and the units on the Pipe Monument mound.  Owen went to work on a detailed profile of CS 2.

CS 2 after excavation and preparation for detailed profiling.
CS 2 after excavation and preparation for detailed profiling.

Once that was well in hand, it still wasn’t clear if we would be able to get home.  I needed to go in to Barrow to make sure everything was progressing with the other project, so we decided I could take trailer load of field gear, samples and some of my gear back to town.  That way, we would need less help getting back, and if the pickup wasn’t going to happen until tomorrow, I could bring back my sleeping bag and sleep in the mess tent.

Once I got to town, I unloaded and did some more work on the other project.  It turned out that some logistics folks were available, so I went back down with them, and we managed to get everything back to town, and into the UICS yellow building.   Everybody got to sleep in a real bed.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s